Electric Power Research Institute Report TR-113594, Resolution of GL 96-06 Waterhammer Issues
ML021570149
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/06/2002
From: Mazafari B
NRC/NRR/DLPM/LPD2
To: Keenan J
Carolina Power & Light Co
mozafari B, NRR/DLPM, 415-2020
Shared Package
ML021570174 List:
References
GL-96-006, TAC M96787, TAC M96788
Download: ML021570149 (4)


Text

June 6, 2002 Mr. J. S. Keenan Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - ELECTRIC POWER RESEARCH INSTITUTE (EPRI) REPORT TR-113594, RESOLUTION OF GENERIC LETTER 96-06 WATERHAMMER ISSUES, VOLUMES 1 AND 2 (TAC NOS. M96787 AND M96788)

Dear Mr. Keenan:

In Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996, the U.S. Nuclear Regulatory Commission (NRC) requested that licensees evaluate the susceptibility of (1) containment air cooler cooling water systems waterhammer and two-phase flow conditions during postulated accident conditions and (2) piping systems that penetrate containment to overpressurization from the thermal expansion of fluid.

In a letter dated January 28, 1997, as supplemented on May 30, 1997, Carolina Power & Light Company (CP&L or the licensee), in part, provided its assessment for the waterhammer and two-phase flow issues for Brunswick Steam Electric Plant, Units 1 And 2. By letter dated April 13, 1998, the NRC requested additional information. CP&L responded in letters dated May 17 and July 30, 1998. In the July 30, 1998 letter, supplemented on August 20, 1999, CP&L indicated its participation in an industry initiative to address the waterhammer concerns and deferred the remaining actions to fully address these concerns pending NRC review and approval of EPRI Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2, dated December 2000.

The NRC staff has completed its review of EPRI Report TR-113594 and has determined that the use of the information in the report for evaluating the GL 96-06 waterhammer issues is acceptable to the extent specified and with the limitations delineated in the EPRI Report and the NRC Safety Evaluation (SE) of the report. Therefore, you are now requested to complete your actions to address GL 96-06 at Brunswick Units 1 and 2 and to submit by July 30, 2002, the supplemental information referenced in Section 3.3 of the NRC SE. If you are unable to

J. S. Keenan meet this schedule, you should contact us to make alternate arrangements. A copy of the April 3, 2002, NRC acceptance letter to EPRI, which includes the NRC SE, is enclosed for your information.

If you have any questions, please call me at (301) 415-2020.

Sincerely,

/RA/

Brenda L. Mozafari, Sr. Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324

Enclosure:

As stated cc w/encl: See next page

J. S. Keenan meet this schedule, you should contact us to make alternate arrangements. A copy of the April 3, 2002, NRC acceptance letter to EPRI, which includes the NRC SE, is enclosed for your information.

If you have any questions, please call me at (301) 415-2020.

Sincerely,

/RA/

Brenda L. Mozafari, Sr. Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC PDII-2 R/F K. Jabbour B. Mozafari J. Tatum B. Wetzel E. Dunnington B. Bonser, R-II OGC ACRS Package: ML021570174 ACCESSION NO.: ML021570149

Enclosure:

ML021190358 Document Name: G:\\PDII-2\\Brunswick\\EPRI-GL9606.wpd OFFICE PDII-2/PM PDII-2/LA PDII-2/SC(A)

NAME BMozafari EDunnington KJabbour DATE 06/05/02 06/05/02 06/05/02 OFFICIAL RECORD COPY

Mr. J. S. Keenan Brunswick Steam Electric Plant Carolina Power & Light Company Units 1 and 2 cc:

Mr. William D. Johnson Ms. Margaret A. Force Vice President and Corporate Secretary Assistant Attorney General Carolina Power & Light Company State of North Carolina Post Office Box 1551 Post Office Box 629 Raleigh, North Carolina 27602 Raleigh, North Carolina 27602 Mr. Donald E. Warren Mr. Robert P. Gruber Brunswick County Board of Commissioners Executive Director Post Office Box 249 Public Staff - NCUC Bolivia, North Carolina 28422 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Resident Inspector U.S. Nuclear Regulatory Commission Mr. C. J. Gannon 8470 River Road Director - Site Operations Southport, North Carolina 28461 Carolina Power & Light Company Brunswick Steam Electric Plant Mr. John H. ONeill, Jr.

Post Office Box 10429 Shaw, Pittman, Potts & Trowbridge Southport, North Carolina 28461 2300 N Street, NW.

Washington, DC 20037-1128 Mr. Norman R. Holden, Mayor City of Southport Mr. Mel Fry, Director 201 East Moore Street Division of Radiation Protection Southport, North Carolina 28461 N.C. Department of Environment and Natural Resources Mr. Dan E. Summers 3825 Barrett Dr.

Emergency Management Coordinator Raleigh, North Carolina 27609-7721 New Hanover County Department of Emergency Management Mr. W. C. Noll Post Office Box 1525 Plant Manager Wilmington, North Carolina 28402 Carolina Power & Light Company Brunswick Steam Electric Plant Mr. Terry C. Morton Post Office Box 10429 Manager Southport, North Carolina 28461 Performance Evaluation and Regulatory Affairs CPB 7 Public Service Commission Carolina Power & Light Company State of South Carolina Post Office Box 1551 Post Office Drawer 11649 Raleigh, North Carolina 27602-1551 Columbia, South Carolina 29211 Mr. Edward T. ONeil Manager - Regulatory Affairs Carolina Power & Light Company Brunswick Steam Electric Plant Post Office Box 10429 Southport, NC 28461