Farley Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/04/2002 09:54:27 Report 22 5
EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 03/04/2002 03/08/2002 Safety System Design and Performance Capability IP 7111121 1, 2 5
EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 03/18/2002 03/22/2002 Safety System Design and Performance Capability IP 7111121 1, 2 1
PS-SEC
- SECURITY Baseline Inspections 05/13/2002 05/17/2002 Access Authorization Program (Behavior Observation Only)
IP 7113001 1, 2 Baseline Inspections 05/13/2002 05/17/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
IP 7113002 1, 2 Baseline Inspections 05/13/2002 05/17/2002 Performance Indicator Verification IP 71151 1, 2 1
BR2-BI
- FLOOD PROTECTION Baseline Inspections 06/24/2002 06/27/2002 Flood Protection Measures IP 7111106 1, 2 2
- REQUAL INSPECTION Baseline Inspections 07/15/2002 07/19/2002 Licensed Operator Requalification IP 7111111B 1, 2 4
EB1-FP
- FP - PRE-INSPECTION VISIT Baseline Inspections 07/22/2002 07/26/2002 Fire Protection IP 7111105T 1, 2 1
EB2-HS
- EB2-HS Baseline Inspections 08/05/2002 08/09/2002 Heat Sink Performance IP 7111107B 1, 2 3
EB1-FP
- FP - INSPECTION Baseline Inspections 08/12/2002 08/16/2002 Fire Protection IP 7111105T 1, 2 2
- EMERGENCY EXERCISE Baseline Inspections 08/19/2002 08/23/2002 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 08/19/2002 08/23/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/19/2002 08/23/2002 Performance Indicator Verification IP 71151 1, 2 3
EB1-FP
- FP - INSPECTION Baseline Inspections 09/09/2002 09/13/2002 Fire Protection IP 7111105T 1, 2 1
EB2-ISI
- EB2-ISI Baseline Inspections 09/16/2002 09/20/2002 Inservice Inspection Activities IP 7111108 2
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 09/16/2002 09/20/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 09/16/2002 09/20/2002 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 09/16/2002 09/20/2002 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 09/16/2002 09/20/2002 Performance Indicator Verification IP 71151 1, 2 1
2515/145
- TI 2515/145 (U2) RE: BULLETIN 01-01 Safety Issues 09/23/2002 09/29/2002 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (NRC Bulletin 2001-01)
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 09/30/2002 10/04/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Farley Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/04/2002 09:54:27 Report 22 3
PS-RP
- RADIATION PROTECTION Baseline Inspections 09/30/2002 10/04/2002 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 09/30/2002 10/04/2002 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 09/30/2002 10/04/2002 Performance Indicator Verification IP 71151 1, 2 1
PS-RP
- RADIATION PROTECTION-@ SMYRNA ENV. LAB Baseline Inspections 10/30/2002 11/01/2002 Radiological Environmental Monitoring Program IP 7112203 1
3 EB2-MODS - EB2-MODS/50.59 Baseline Inspections 02/10/2003 02/14/2003 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 02/10/2003 02/14/2003 Permanent Plant Modifications IP 7111117B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.