North Atlantic Energy Service Corporation P.O. Box 300 Nor Seabrook, NH 03874 Atlantic (603) 474-9521 The Northeast Utilities System February 12, 2002 Docket No. 50-443 NYN-02019 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station January 2002 Monthly Operating Report Enclosed please find Monthly Operating Report 02-01. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of January, 2002 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this

matter, please contact Mr. James M. Peschel, Manager - Regulatory Programs, at (603) 773-7194.

Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.

Gene F. St. Pierre Station Director cc:

H. J. Miller, NRC Region I Administrator G. F. Wunder, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector

OPERATING DATA REPORT DOCKET NO.

50-443 UNIT Seabrook I DATE February 1, 2002 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074 OPERATING STATUS

1.

Unit Name:

Seabrook Station Unit 1

2.

Reporting Period:

JANUARY 2002

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1148.0

5.

Maximum Dependable Capacity (Net MWe):

1155.3

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

Not Applicable Since Last Report, Give Reasons:

This Month Yr-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 744.0 744.0 87247.9

8.

Hours Generator On-Line 744.0 744.0 84452.7

9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 861490 861490 94747022 1 of 2 OPERATING

SUMMARY

The unit operated at 100% Rated Thermal Power (RTP) for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.2% based on the MDC value of 1155.3 Net MWe.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-443 UNIT Seabrook 1 DATE February 1, 2002 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074 MONTH: JANUARY 2002 NO.

DATE TYPE' DURATION REASON 2 METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR COMMENTS No entries for this month.

2 3

F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain) 2 of 2