L-03-133, Service List Update
| ML032460715 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 08/27/2003 |
| From: | Pearce L FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-03-133 | |
| Download: ML032460715 (1) | |
Text
FENOC FirstEnergy Nuclear Operating Company Beaver Valley Power Station Route 168 P.O. Box4 Shippingport, PA 15077-0004 L William Pearce Site Vice President 724-682-5234 Fax: 724-643-8069 August 27, 2003 L-03-133 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station (BVPS), Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Service List Update Please replace Mr. M. P. Pearson, Director, Services and Projects (BV-IPAB) with Mr. R.
G. Mende, Director, Work Management (BV-IPAB) on the service list for Beaver Valley Power Station, Units 1 and 2.
There are no regulatory commitments contained in this letter. If there are any questions concerning this request, please contact Mr. Larry R. Freeland, Manager, Regulatory Affairs/ Performance Improvement at (724) 682-5284.
Sincerely, William Pearce c:
Mr. T. G. Colburn, NRR Senior Project Manager Mr. D. M. Kern, NRC Sr. Resident Inspector Mr. R. J. Conte, Chief, Operational Safety Branch Mr. H. J. Miller, NRC Region I Administrator H 0ADctY;