EA-24-088 JAFP-25-0002 January 3, 2025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-059 NRC Docket No. 50-333

Subject:

Notification of Readiness for NRC 95001 Inspection

References:

1.

NRC letter, Follow-up to Inspection Procedure 71153 Report 05000333/20240011 and Preliminary White Finding and Apparent Violation, ML24262A197, dated September 19, 2024

2.

JAF letter, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088, JAFP-24-0051, dated October 3, 2024

3.

NRC letter, Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000333/2024090, ML24299A214, dated October 29, 2024

Dear Sir or Madam:

On September 19, 2024, the NRC notified James A. FitzPatrick Nuclear Power Plant (JAF) of an escalated enforcement action, EA-24-088, associated with a preliminary White Finding,05000333/2024011-01 [Reference 1]. This finding concerns the B Emergency Diesel Generator (EDG) Gallery Supply Lube Oil Check Valve Failure that occurred on April 24, 2024.

On October 29, 2024, the NRC provided a final significance determination of a White Finding and Notice of Violation [Reference 3].

In Reference 3, the NRC stated plans to conduct a supplemental inspection for this finding in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) inputs, following JAFs notification of the readiness for this inspection.

This letter serves as notification to the NRC that JAF is prepared for the 95001 supplemental inspection.

James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Alex D. Sterio Site Vice President

There are no new regulatory commitments contained in this letter.

JAFP-25-0002 Page 2 of 2 If you should have any questions, please contact Mrs. Chelsea E. Troutman, Regulatory Assurance Manager, at 667-313-6062.

Respectfully, Alex D. Sterio Site Vice President ADS/GET cc: