Inservice Inspection Summary Report Cycle 26
ML24344A175
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/09/2024
From: Mark Hawes
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
JAFP-24-0065
Download: ML24344A175 (1)


Text

JAFP-24-0065 December 9, 2024 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333

Subject:

Inservice Inspection Summary Report Cycle 26

Reference:

1)

Exelon letter, Fifth Ten-Year Inservice Inspection Interval Program Plan, JAFP-18-0113, dated December 17, 2018

Dear Sir or Madam:

This letter submits the James A. FitzPatrick Nuclear Power Plant (JAF) Owner's Activity Report (OAR-1), Third Period, Fifth Interval which contains a summary of the lnservice Inspection (ISI) examinations conducted during the 2024 Refuel Outage 26 (J1R26).

Table 1 of the enclosed report summarizes the items with flaws or relevant conditions that required evaluation for continued service and Table 2 provides an abstract of repair/replacement activities required for continued service.

This report is being submitted in accordance with JAFs approved Fifth Interval Inservice Inspection Program Plan [Reference 1].

There are no new regulatory commitments contained in this letter. If you have any questions in this regard, please contact Mr. Jennifer Bianculli, Manager Engineering, at (267) 533-5238.

Very truly yours, Mark Hawes Regulatory Assurance MH

Enclosure:

JAF Owners Activity Report (OAR-1) Third Period, Fifth Interval cc:

NRC Region 1 Administrator NRC Project Directorate NRC Resident Inspector NYSERDA James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Mark Hawes Regulatory Assurance

JAFP-24-0065 ENCLOSURE JAF Owners Activity Report (OAR-1)

Third Period, Fifth Interval (3 Pages)

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number J1R26 Plant James A. FitzPatrick Nuclear Power Plant, 268 Lake Rd., Lycoming, New York 13093 Unit No.

1 Commercial service date July 28, 1975 Refueling outage no.

J1R26 (if applicable)

Current Inspection Interval Fifth Inservice Inspection Interval (ISI) & Third Inspection Interval (CISI) August 01, 2017 to June 15, 2027 (1st, 2nd, 3rd, 4th, Other)

Current Inspection Period Third Inspection Period (ISI & Containment ISI)

January 01, 2024 to June 15, 2027 (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plan ASME Section XI 2007 Edition, 2008 Addenda Date and Revision of Inspection Plan ISI Program Plan (ER-JF-330-1001), Rev.4 (7/10/2024), Rev.3 (9/7/2023 ), Rev.2 (9/17/2020)

Edition and Addenda of ASME Section XI applicable to Repairs and Replacements activities, if different than the Inspection Plan: Same as above Code Cases used for inspection and evaluation: N-513-4, N-532-5, N-552, N-613-2, N-639,N-702, N-716-1, N-858, N-864, N-878 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) statements made in this report are correct; (b) the examination and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of J1R26 conform to the requirements of Section XI. (refueling outage number)

Signed______________________________________________________________ Date _______________________________

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, CT have inspected the items described in this Owner's Activity Report and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

_______________________________________________Commissions 16158 ANIR NY5570__________________

Inspector's Signature National Board, State, Province, and Endorsements Date_____________________

,JAF Materials Program Engineer

Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Number Item Description Evaluation Description D-B, D2.10 ESW Line 15-

-WES-151-103 A through-wall leak was identified on Class 3 Emergency Service Water piping line 15-

-WES-151-103.

ASME Section XI Code Case N-513-4 was employed.

IR 04698790, Op Eval 639679 D-B, D2.10 ESW Line 15-3"-WES-151-136 Two through-wall leaks were identified on Class 3 Emergency Service Water piping 15-3"-WES-151-136.

ASME Section XI Code Case N-513-4 was employed.

IR 04699435 & 04699460, Op Eval 639700 D-B, D2.10 ESW Line 15-3"-WES-151-136 A through-wall leak was identified on Class 3 Emergency Service Water piping 15-3"-WES-151-136.

ASME Section XI Code Case N-513-4 was employed.

IR 04702273, Op Eval 639783 F-A, F1.30c PFSK-4265, Variable spring support VT-3 examination of variable support PFSK-4265 identified that the cold load setting was out of tolerance and a loose nut was observed. The as found condition was evaluated per EC 642393 and it was determined the support can perform the intended design function in the as found condition.

IR 4800448, EC 642393 E-A, E1.12 Wetted Surfaces of Submerged Areas.

VT-3 visual examination of the torus shell plates for bays M, B, P, H, and N. The inspection identified pressure retaining components corrosion or erosion that exceed 10% of the nominal wall thickness at James A.

FitzPatrick. EC 642445 evaluated the as found condition as acceptable for continued service.

IR 0401108 & 04801291, EC 642445

Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number 3

Emergency Service Water line piping 15-

-WES-151-103 Replace piping 15-

-WES-151-103 per work order 05394912 9/20/2023 23-017 3

Emergency Service Water line piping 15-

-WES-151-136 Repair Line 15-

-WES-151-136 utilizing LokRing (Per EC 639704 &

Work Order 05395735) 9/20/2023 23-018 3

Emergency Service Water line piping 15-

-WES-151-136 Repair Line 15-

-WES-151-136 utilizing LokRing (Per EC 639704 &

Work Order 05399718) 9/20/2023 23-020 3

Emergency Service Water Pump 46P-2B Bolting Replace degraded pump casing bolting on 46P-2B per work order 05575941 9/14/2024 24-032