JAFP-23-0050, Physical Security Plan, Revision 24

From kanterella
Jump to navigation Jump to search
Physical Security Plan, Revision 24
ML23250A022
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/31/2023
From: Bellomo M
Constellation Energy Generation
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-23-0050
Download: ML23250A022 (1)


Text

SAFEGUARDS INFORMATION r

zµ Constellation~

JAFP-23-0050 August 31, 2023 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852-2738

Subject:

James A FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-059 Docket No. 50-333 Physical Security Plan, Revision 24

Dear Sir or Madam:

James A. FitzPatrick NPP P.O. Box 110.

Lycoming, NY 13093 Tel 315-349-6183 Matt Bellomo Sr. Manager, Site Security Constellation Energy Generation, LLC has revised the James A FitzPatrick Nuclear Power Plant (JAF) Physical Security Plan (PSP) in accordance with 10 CFR 50.54(p)(2).

Revision 24 was effective on August 22, 2023.

In accordance with 10 CFR 50.54{p)(2}, the revised PSP (Revision 24) is included as with this letter. The Attachment contains a summary of changes and contains a 10 CFR 50.54(p) evaluation of the changes.

The Attachment, Enclosure 1, and Enclosure 2 contains Safeguards Information as defined in 10 CFR 73.2. Exelon, therefore, requests that the Attachment, Enclosure 1, and Enclosure 2 be withheld from public disclosure.

There are no new regulatory commitments contained in this letter. If you have any questions or require additional information, please contact me at (315) 349-6183.

Matt Bellomo Sr. Manager, Site Security MB/ro cc: next page NOTICE: Only the Attachment, Enclosure 1, and Enclosure 2, Physical Security Plan and its Appendices, contain "Safeguards Information". Upon separation of the Attachment, Enclosure 1, and Enclosure 2 from this letter, this page becomes "DECONTROLLED".

SAFEGUARDS INFORMATION

p SAFEGUARDS INFORMATION JAFP-23-0050

Attachment:

Summary of Changes 10 CFR 50.54(p) Evaluation JAF Physical Security Plan, Training & Qualification Plan, and Safeguards Contingency Plan, Revision 24, August 22, 2023.

cc:

NRC Region I Administrator (with Attachment and Enclosures)

NRC Project Manager (without Attachment or Enclosures)

NRC Resident Inspector's Office (without Attachment or Enclosures)

Page 2 of 2 NOTICE: Only the Attachment, Enclosure 1, and Enclosure 2, Physical Security Plan and its Appendices, contain "Safeguards Information". Upon separation of the Attachment, Enclosure 1, and Enclosure 2 from this letter, this page becomes "DECONTROLLED".

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION JAFP-23-0050 Attachment Summary of Changes NOTICE: Only the Attachment, Enclosure 1, and Enclosure 2, Physical Security Plan and its Appendices, contain "Safeguards Information". Upon separation of the Attachment, Enclosure 1, and Enclosure 2 from this letter, this page becomes "DECONTROLLED".

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION JAFP-23-0050 10 CFR 50.54(p) Evaluation NOTICE: Only the Attachment, Enclosure 1, and Enclosure 2, Physical Security Plan and its Appendices, contain "Safeguards Information". Upon separation of the Attachment, Enclosure 1, and Enclosure 2 from this letter, this page becomes "DECONTROLLED".

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION JAFP-23-0050 JAF Physical Security, Training & Qualification, and Safeguards Contingency Plan, Revision 24 August22,2023 NOTICE: Only the Attachment, Enclosure 1, and Enclosure 2, Physical Security Plan and its Appendices, contain "Safeguards Information". Upon separation of the Attachment, Enclosure 1, and Enclosure 2 from this letter, this page becomes "DECONTROLLED".

SAFEGUARDS INFORMATION