JAFP-04-0186, November 2004 Monthly Operating Report for James A. FitzPatrick
| ML043510060 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 12/07/2004 |
| From: | Ted Sullivan Entergy Nuclear Northeast, Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| JAFP-04-0186 | |
| Download: ML043510060 (3) | |
Text
Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 December 7, 2004 JAFP-04-0 186 T.A. Sullivan Site Vice President - JAF U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 November 2004 Monthly Oneratin2 Renort
Dear Sir:
Enclosed is the Monthly Operating Report (MOR) for the James A. FitzPatrick Nuclear Power Plant for the month of November 2004.
MOR data has been prepared and formatted using the INPO Consolidated Data Entry (CDE) submittal process.
Should you have any questions concerning this report, please direct them to Mr. Mick Baker, Thermal Performance Engineer, at (315) 349-6181.
TAS:MB:dr Enclosure Jeoql
p cc:
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Office of the Resident Inspector James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Patrick Milano, Sr. Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop MS-8-C2 Washington, DC 20555-0001 Mr. Ronald Toole ENN BWR SRC Operations Subcommittee Chairman 1282 Valley of Lakes Box R-10 Hazelton, PA 18202 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223-1350 JENG JAFP Files RMS (JAF)
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-333 FitzPatrick I December 02,2004 Mick Baker 315-349-6181 November 2004 1.
2.
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 816.00 813.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date 720.00 7,343.75 720.00 7,242.64 0.00 0.00 612,230.00 5,818,387.00 Cumulative 197,248.25 191,813.84 0.00 143,724,151.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- The plant commenced a planned down power to 65% on 11/16/2004 at 0825 hours0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br /> to perform control rod pattern adjustments and to perform routine scheduled maintenance. The plant returned to full power on 11/1712004 at 1333 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.072065e-4 months <br />.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 1