SUBJECT:
MCGUIRE NUCLEAR STATION - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000369/2022011 AND 05000370/2022011
Dear Mr. Pigott:
On September 1, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your McGuire Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspection team reviewed the stations problem identification and resolution program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for problem identification and resolution programs.
Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.
Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
Finally, the team reviewed the stations programs to establish and maintain a safety conscious work environment, and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews the team found no evidence of challenges to your organizations safety-conscious work environment. Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available.
No findings or violations of more than minor significance were identified during this inspection.
September 29, 2022 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Eric J. Stamm, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 05000369 and 05000370 License Nos. NPF-17 and NPF-9
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000369 and 05000370
License Numbers:
Report Numbers:
05000369/2022011 and 05000370/2022011
Enterprise Identifier:
I-2022-011-0029
Licensee:
Duke Energy Carolinas, LLC
Facility:
McGuire Nuclear Station
Location:
Huntersville, North Carolina
Inspection Dates:
August 15, 2022, to September 1, 2022
Inspectors:
J. Bream, Reactor Operations Engineer
D. Jackson, Senior Project Engineer
M. Kirk, Resident Inspector
K. Pfeil, Resident Inspector
J. Rivera, Health Physicist (Team Lead)
F. Young, Resident Inspector
Approved By:
Eric J. Stamm, Chief
Reactor Projects Branch 1
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at McGuire Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES - BASELINE
71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 03.04)
- (1) The inspectors performed a biennial assessment of the effectiveness of the licensees Problem Identification and Resolution program, use of operating experience, self-assessments and audits, and safety-conscious work environment.
Problem Identification and Resolution Effectiveness: The inspectors assessed the effectiveness of the licensees Problem Identification and Resolution program in identifying, prioritizing, evaluating, and correcting problems. The inspectors conducted an in-depth corrective action program review of the emergency diesel generators, primary pressure relief system, reactor protection system, and residual heat removal system. The inspectors also conducted a five-year review of equipment aging issues.
Operating Experience: The inspectors assessed the effectiveness of the licensees processes for use of operating experience.
Self-Assessments and Audits: The inspectors assessed the effectiveness of the licensees identification and correction of problems identified through audits and self-assessments.
Safety-Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.
INSPECTION RESULTS
Assessment 71152B 1) Corrective Action Program Effectiveness Problem Identification: The inspectors determined that the licensee was effective in identifying problems and entering them into the corrective action program (which includes the work management system), and there was a low threshold for entering issues into the corrective action program. This conclusion was based on a review of the requirements for initiating condition reports as described in licensee procedure AD-PI-ALL-0100, Corrective Action Program. Additionally, site management was actively involved in the corrective action program and focused appropriate attention on significant plant issues.
Problem Prioritization and Evaluation: Based on the review of condition reports, work orders, and work requests, the inspectors concluded that problems were prioritized and evaluated in accordance with licensee guidance. The inspectors determined that adequate consideration was given to system or component operability and associated plant risk. The inspectors determined that in general, plant personnel had conducted cause evaluations in compliance with the licensees corrective action program procedures and cause determinations were appropriate, and considered the significance of the issues being evaluated. The inspectors noted an example in which a cause investigation was not performed with input or team membership from all the impacted work groups.
Corrective Actions: Based on a review of corrective action documents, interviews with licensee staff, and verification of completed corrective actions, the inspectors determined that generally, corrective actions were timely, commensurate with the safety significance of the issues, and effective, in that conditions adverse to quality were corrected. The team determined that the licensee was generally effective in developing corrective actions that were appropriately focused to also address the root and contributing causes for significant conditions adverse to quality to preclude repetition. Effectiveness reviews for corrective actions to preclude repetition were sufficient to ensure corrective actions were properly implemented and were effective. The inspectors noted that while issue evaluations were generally sound, there were several examples where additional research was needed to verify that the appropriate corrective actions were taken, primarily due to a lack of clear documentation.
Based on the samples reviewed, the team determined that the licensees corrective action program complied with regulatory requirements and self-imposed standards. The licensees implementation of the corrective action program adequately supported nuclear safety.
2) Operating Experience The team determined that the stations processes for the use of industry and NRC operating experience information were effective and complied with regulatory requirements and licensee standards. The implementation of these programs adequately supported nuclear safety. The team concluded that operating experience was adequately evaluated for applicability and that appropriate actions were implemented in accordance with applicable procedures.
3) Self-Assessments and Audits The inspectors determined that the licensee was effective at performing self-assessments and audits to identify issues at a low level, properly evaluated those issues, and resolved them commensurate with their safety significance. The self-assessments and audits were adequately self-critical and performance-related issues were being appropriately identified.
The inspectors verified that action requests were created to document areas for improvement and findings, and verified that actions had been completed consistent with those recommendations.
4) Safety-Conscious Work Environment Based on interviews with plant staff and reviews of the latest safety culture survey results, the team found no evidence of challenges to a safety-conscious work environment. Employees interviewed appeared willing to raise nuclear safety concerns through at least one of the several means available. The team noted that most interviewees were not familiar with the employee concerns program (ECP), specifically how to raise issues through the ECP, or who to contact on site. However, most interviewees did not feel the need to use the ECP because they were comfortable raising issues through other available avenues (e.g., directly to supervisor, CAP). The inspectors noted that issues were still being received and evaluated by the ECP.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On September 1, 2022, the inspectors presented the biennial problem identification and resolution inspection results to Edward Pigott and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Action Requests/
Nuclear Condition
Reports
1602401, 1901652, 1901680, 1903851, 2144585, 2319149,
22913, 2322919, 2341150, 2342263, 2343042, 2345431,
2345540, 2345554, 2346955, 2347278, 2347978, 2349001,
2350343, 2350399, 2350439, 2350580, 2350594, 2350812,
2351284, 2351390, 2351528, 2352540, 2352910, 2353135,
2353136, 2353720, 2353849, 2354684, 2354856, 2356013,
2356914, 2357980, 2358963, 2361705, 2362712, 2363477,
2364011, 2365763, 2366707, 2368247, 2373625, 2375165,
2376571, 2377164, 2377999, 2378727, 2379404, 2381103,
2382363, 2383351, 2383431, 2383680, 2384058, 2384241,
2384252, 2385383, 2387603, 2388454, 2388954, 2390934,
2392095, 2393230, 2393939, 2395628, 2397398, 2397401,
2397559, 2397771, 2397852, 2398409, 2399977, 2400331,
2402441, 2405373, 2405546, 2407688, 2408408, 2408815,
2410147, 2410295, 2410299, 2410546, 2411069, 2412576,
2412641, 2414512, 2415844, 2416694, 2417610, 2417617,
20932, 2421363, 2422181, 2422368, 2422405, 2422881,
23492, 2424370, 2424814, 2425323, 2427036, 2427731,
28564, 2430759, 2431847, 2434294, 2434712
Operating
Experience
Evaluations
2340642, 02341893, 02344296, 02349344, 02356287,
2363181, 02391622, 02397087
Engineering
Evaluations
Maintenance Rule
Evaluations
EVAL-2020-MC-NI-00002151,
EVAL-2020-MC-EPB-00002152,
EVAL-2021-MC-EQS-00002194,
EVAL-2022-MC-EDG-00002221,
EVAL-2020-MC-EQS-00002147
Miscellaneous
LCOTR A-1-20-02284
LCOTR A-0-20-02137
LCOTR A-2-21-02104
AD-AD-ALL-0007
Oversight of Non-Site Assigned Personnel
Procedures
AD-EG-ALL-1210
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AD-EG-ALL-1211
System Performance Monitoring and Trending
AD-EG-ALL-1720
Inservice Testing (ITS) Program Implementation
AD-EP-ALL-0100
Emergency Response Organization
AD-LS-ALL-0019
On-Site Review Committee
AD-MN-ALL-1000
Conduct of Maintenance
AD-PI-ALL-0100
Corrective Action Program
25, 26, 27
AD-PI-ALL-0106
Cause Investigation Checklists
AD-WC-ALL-0200
On-Line Work Management
AD-WC-ALL-0210
Work Request Initiation, Screening, Prioritization, and
Classification
CSD-AD-ALL-
0004-01
Corrective Action Program Review Meeting
TE-MN-ALL-0610
Radiation Shielding Use
Work Orders
WR 20201943, WR 20204244, WR 20204245, WR 2019047,
WR 20147682, WR 20151989, WR 20177058, WO 20442796, WO 20406857, WO 20433984, WO 20433974,
WO 02126855, WO 20425882, WO 20442581, WO 299266, WO 20475216, WO 20475221, WO 20493343,
WO 20493344, WO 20495243, WR 20188859, WR 20187005, WR 20215654, WO 20503923, WO 20410272,
WR 20208281, WR 20216952, WO 2049305, WO 20495230,
WO 20417792, WO 20203064, WO 20210207, WO 210362, WO 20183498, WO 20205953, WO 20190333,
WO 20227730, WO 20211098, WO 20126542, WR 20149739, WR 20188553, WR 20423863, WR 20384555,
WR 20384556, WR 20384558, WR 20231270, WR 01970055, WR 20210809, WR 20202945, WR 20198258,