HNP-03-057, April 2003 Monthly Operating Report for Shearon Harris
| ML031410663 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/13/2003 |
| From: | Caves J Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-03-057 | |
| Download: ML031410663 (3) | |
Text
Progress Energy Serial: HNP-03-057 MAY 1 3 2003 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT
Dear Sir or Madam:
In accordance with Technical Specification 6.9.1.5 for Progress Energy Carolinas, Inc's (alternately known as Carolina Power and Light Co.) Harris Nuclear Plant, the report of operating statistics and shutdown experience for the month of April 2003 is provided.
Sincerely, John R. Caves Supervisor, Licensing and Regulatory Programs Harris Nuclear Plant SGR/sgr Enclosure c:
Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region H)
Mr. C. P. Patel (NRC Project Manager, HNP)
Progress Energy Carolinas. Inc.
Harris Nuclear Plant P.O.
Box 165 New Hill, NC 27562 z -, :;
- \\e
United States Nuclear Regulatory Commission Page 2 bc:
Mr. Tom C. Bell Mr. Stephen Carr Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Duncan II Mr. K. N. Harris Mr. C. S. Hinnant Mr. H. L. James Mr. R. D. Martin Mr. T.- C. Morton-Mr. W. S. Orser Mr. J. Scarola Mr. J. M. Taylor Mr. B. C. Waldrep Mr. W. G. Wendland (American Nuclear Insurers)
Licensing Files (2)
Nuclear Records
Enclosure to Serial HNP-03-057 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 1
Shearon Harris Nuclear Power Plant May 10, 2003 Charles L. George (919) 362-2937 REPORTING PERIOD April 2003 (Month/Year)
TYPE METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO.
(yymmdd)
S: SCHEDULED I(HOURS)
REASON (1)
DOWN (2)
COMMENTS03-001 030426 S
119.9 C
I Shutdown for scheduled refueling outage II I
] __
_ i I
[ _
I
SUMMARY
- The unit operated at full power until 4/25, when power reduction commenced for a scheduled refueling outage (RFO-1 1). The outage began onj 4/26/03.
(1) Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method:
I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
I