GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections
| ML19184A572 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 07/03/2019 |
| From: | Emily Larson Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GNRO-2019/00027 | |
| Download: ML19184A572 (2) | |
Text
~Entergx GNR0-2019/00027 July 3, 2019 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Entergy Operations, Inc.
P.O. Box756 Port Gibson, Mississippi 39150 Eric A. Larson Site Vice President Grand Gulf Nuclear Station Tel 601-437-7500
Subject:
Notification of Readiness of 95001 Supplemental Inspections Grand Gulf Nuclear Station, Unit 1 NRC Docket No. 50-416 Renewed Facility Operating License No. NPF-29
Reference:
- 1.
NRC letter dated August 1, 2018, "Grand Gulf Nuclear Station - NRC Supplemental Inspection Report 05000416/2018040 And Assessment Follow-Up Letter," (ADAMS Accession Number MI18211A174)
- 2.
NRC letter dated March 4, 2019, "Annual Assessment Letter For Grand Gulf Nuclear Station (Report 05000416/2018006)," (ADAMS Accession Number ML19064A731)
Dear Sir or Madam:
This letter serves as notification of Grand Gulf Nuclear Station's (GGNS's) readiness for your office to perform a 95001 Supplemental Inspection. This inspection is associated with two White Performance Indicators (Pis). During the Third Quarter 2018, GGNS exceeded the White threshold for the Unplanned Power Changes per 7000 Critical Hours Pl. During the following quarter, the station also exceeded the White PI threshold for Unplanned Scrams per 7,000 Critical Hours. Both of these Pis are in the Initiating Events Cornerstone (Reference 1 and 2).
GNR0-2019/00027 Page 2 of2 This letter contains no new commitments. If you have any questions or require additional information, please contact Stephenie Pyle at 601-368-5516.
Respectfully,
- z:ct _____
Eric A. Larson EAUrws cc:
NRC Region IV, Regional Administrator NRC Senior Resident Inspector, Grand Gulf Nuclear Station NRC Project Manager, Grand Gulf Nuclear Station State Health Officer, Mississippi Department of Health