EPID:L-2020-LLR-0119
From kanterella
Jump to navigation
Jump to search
EPID - L-2020-LLR-0119, CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval (Open) 1 September 2020 - 2 June 2021 | |
|---|---|
Request for: - Relief Request Open | |
| |
| From: | |
MONTHYEARAEP-NRC-2020-60, Unit 2 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-09-0101 September 2020
[table view]Title: Unit 2 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20247J6562020-09-10010 September 2020 Title: Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI AEP-NRC-2020-51, CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval2020-10-0505 October 2020 Title: CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2021-16, Unit 2 - Response to Request for Additional Information Regarding CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval2021-02-25025 February 2021 Title: Unit 2 - Response to Request for Additional Information Regarding CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval 05000316/LER-2020-004-01, Regarding Unit 2 Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level2021-02-25025 February 2021 Title: Regarding Unit 2 Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level ML21141A2612021-06-0202 June 2021 Title: Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval 2020-09-10 | |