Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating license No. DPR-72 Ref: ITS 5.7.1.2 October 13, 2004 3F1004-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - September 2004 Monthly Operating Report
Dear Sir:
Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) September 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr.
Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Sid Powell, Si Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 I--F&
a
APPENDIX A OPERATING DATA REPORT DOCKET NO.
50-302 UNIT NAME FLCRP-3 DATE October 1 2004 COMPLETED BY J.E. Lane TELEPHONE (352) 795-6486 x3698' REPORTING PERIOD (Month/Year):
September 2004 MONTH YEAR TO DATE CUMULATIVE 2
DESIGN ELECTRICAL RATING (MWe-Net)
MAXIMUM DEPENDABLE CAPACITY (MWe-Net) 860 838 3
NUMBER OF HOURS REACTOR WAS CRITICAL 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 5
UNIT RESERVE SHUTDOWN HOURS 6
NET ELECTRICAL ENERGY GENERATED (MWH) 598.8 592.7 0.0 497,578 6,404.0 6,376.0 0.0 5,416,706 172,475.3 170,103.6 0.0 133,265,707
p APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE October 1, 2004 COMPLETED BY J.E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
September 2004 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments 2004-03 09/06/2004 F
127.35 H
3 Switchyard breaker flashover during Hurricane Frances led to an automatic reactor trip.
SUMMARY
Crystal River Unit 3 experienced an automatic reactor trip during Hurricane Frances due to a flashover on a switchyard breaker. Salt spray caused the flashover to occur on the breaker which in turn caused protective relaying to strip the bus which powered the Startup Transformer. All plant non-safety buses were lost as a result. Prior to the breaker flashover, the other power feed to the Startup Transformer had been lost in the storm when an insulator located off-site failed on the 230KV Brookridge transmission line.
(1) Reason:
(2) Method:
A-EQUIPMENT FAILURE (Explain)
B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)
H-OTHER (Explain) 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)