i.-
O Power C OR POR ATION t
August 30, 1990 3F0890-23
]
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Decommissioning Financial-Assurance Report
Reference:
FPC to NRC letter No. 3F0790-05, Decommissioning Financial Assurance Report, dated July 26, 1990
Dear Sir:
The statement in the referenced letter that the cost of the removal and disposal of spent fuel and non-radioactive structures and material was not included in the amount of decommissioning funds being collected-.is incorrect.~
The amount FPC is collecting exceeds the amount necessary based on the NRC formula and does include the estimated cost of removal and disposal of non-radioactive structures--
and materials (but not spent fuel).
Sincerely, l
lp
.M.
eard, Jr.
Senio Vice President Nuclear Operations PMB/KRW xc:
Regional Administrator, Region II J
Senior Resident Inspector
(') '7
- O tI41 f{
g0 9009100233 900830 PDR ADOCK 0500 2
POST OFFICE BOX 219
~
.