3F0624-02, Report of Investigation Pursuant to 10 CFR 20, Appendix G
| ML24165A121 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/13/2024 |
| From: | Reid B ADP CR3 |
| To: | Ray Lorson NRC Region 1, Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| 3F0624-02, 10 CFR 20, Appendix G | |
| Download: ML24165A121 (1) | |
Text
ADP CR3, LLC CR3 Decommissioning 15760 West Power Line Street l Crystal River, FL 34428 Page 1 of 2 Billy Reid, Site Executive Cellphone: 865-384-6789 Email: breid@northstar.com 3F0624-02 10 CFR 20, Appendix G June 13, 2024 Mr. Raymond K. Lorson Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Rd, Suite 102 King of Prussia, PA
Subject:
Report of Investigation Pursuant to 10 CFR 20, Appendix G Crystal River 3 Nuclear Power Station Docket Numbers 50-302 License Number DPR-72
Dear Sir,
This letter documents the results of an investigation performed with respect to the transportation of 1 shipment by Barge and Truck, containing UN2916, Type B material which exceeded the 45 day time limit for notification of receipt from the disposal facility as specified in 10 CFR Part 20, Appendix G, as exempted. The investigation, which was completed on June 10, 2024, determined that the logistics of the package was tracked continuously during transport by Orano.
The disposal facility, Waste Control Specialists (WCS), and the Crystal River 3 waste operations personnel received daily updates from Orano personnel.
10 CFR 20, Appendix G, Requirements for Transfers of Low-Level Radioactive Waste Intended for Disposal at Licensed Land Disposal Facilities and Manifests,Section III.A(9) states for any shipments or any part of a shipment for which acknowledgment of receipt has not been received within the times set forth in this appendix, conduct an investigation in accordance with Section III.E of this appendix.
Section III.E states that any shipment or part of shipment for which acknowledgement is not received within the times set forth in this section must:
- 1. Be investigated by the shipper if the shipper has not received notification or receipt within 20 days after transfer (45 days in accordance with the current exception for CR3 per ML21028A590); and
- 2. Be traced and reported. The investigation shall include tracing the shipment and filing a report with the nearest Commission Regional Office listed in Appendix D to this part.
Each licensee who conducts a trace investigation shall file a written report with the appropriate NRC Regional Office within 2 weeks of completion of the investigation.
ADP CR3, LLC CR3 Decommissioning 15760 West Power Line Street l Crystal River, FL 34428 Page 2 of 2 Investigation On January 22, 2024, 1 shipment by Barge/Truck departed from the Crystal River 3 site at 15760 West Power Line Street in Crystal River, Florida to Waste Control Specialists, LLC in Andrews Texas.
Crystal River 3 and Waste Control Specialists, LLC received daily tracking reports from Orano logistics coordinators. The location of the subject shipment was verified, and logistics of the package was tracked continuously during transport by Orano until receipt at the destination facility. Crystal River 3 and Waste Control Specialists, LLC tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location. The shipment was placed at the disposal facility by Orano on June 4, 2024.
The CR3MP was released to the first carrier on the date identified above. After release in January from the Crystal River 3 site, CR3MP was transported for 134 days before the shipment was received at the disposal facility on June 4, 2024.
Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G (as exempted). The summary includes the shipment identification (manifest) number, transporters identification (ID) number, shipment date, date of receipt at the waste disposal facility, and the total number of days the shipment was in transit.
Manifest Number Number Date Shipped Date Received at Waste Control Specialists, LLC.
Total Days In Transit OR-CR3-24-003 CBC 4508 - Barge PM 008 - Truck 1/22/2024 6/4/2024 134 This letter contains no new regulatory requirements.
Should you have any questions concerning this letter, please contact Mr. John T. Jernigan at (352) 224-1200, Ext 2998.
Sincerely, Billy Reid Nuclear Executive Cc: NMSS Project Manager Regional Administrator, Region 1 Regional Administrator, Region 2