05000443/FIN-2018001-01
Jump to navigation
Jump to search
| Site: | Seabrook |
|---|---|
| Report | IR 05000443/2018001 Section 4OA7 |
| Date counted | Mar 31, 2018 (2018Q1) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Licensee-identified |
| Inspection Procedure: | |
| Inspectors (proximate) | P Cataldo P Meier D Beacon J Furia N Floyd F Bower |
| Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |