05000311/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 82-011/03L-0.Detailed Event Analysis Encl
ML20041F196
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/03/1982
From: Midura H
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20041F197 List:
References
NUDOCS 8203160282
Download: ML20041F196 (3)


LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3111982011R00 - NRC Website

text

-

. O

- : PSEG Public ServKe Ele <_tric rin<j G.is Cornruny P O. Box E Hancocks Br idge, New Jerwy 08038 Salem Generating Station March 3, 1982 k

.G Mr.

R.

C.

Ilaynes p

g Regional Administrator EECgfyED 9

USNRC Region 1 MSkl'$ Jgg2 b3 631 Park Avenue

{ "*gaut trg. ~

/

King of Prussia, Pennsylvania 19406

, Ga7

Dear Mr. Ilaynes :

f, TG LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 82-ll/03L Pursuant to the requirements of Salem Generating Station Unit No. 2, Technical Specifications, Section 6.9.1.9.d, we are submitting Licensee Event Report for Reportable Occurrence 82-ll/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours, O'

Q II.

J.

Midura General Manager -

Salem Operations FD:al CC:

Distribution 82031602a2 8203o3 gd(

PDR ADOCK 05000311

\\

S PDR

+ 2 v. m n -

i i

Report Number:

82-ll/03L Report Date:

03-03-82 Occurrence Date:

02-05-82 Facility:

Salem Generating Station, Unit 2

~

Public Service Electric &: Gas Company 1

Hancocks Bridge, New Jersey 08038 IDENTIFICATIO," OF OCCURRENCE:

Unplanned Radioa. 'ive Release - Hot Laundry Area.

This report was initiated by Incident Report 82-030.

i CONDITIONS PRIOR TO OCCURRENCE:

E Mode 1 - Rx Power 95% - Unit Load 1100 MWe I

DESCRIPTION OF OCCURRENCE:

J l

On February 5, 1982, while doing a routine radiological survey of the Hot Laundry Trailer Area, a technician discovered small 3

bits of lint coming from the dryer exhaust of Trailer B.

The air sample of the exhaust indicated airborne particulate activity of 1.5X10-10 ci/cc.

All operations in the laundry trailer were p

I immediately secured.

The occurrence was deemed a Significant Event as defined in 10CFR50.72.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

An inspection of the dryer units revealed that the HEPA filters.

4 were_either improperly installed or became loose.in transportation because the brackets holding the filter in place were loose, allowing a certain amount of lint to circumvent the filter.

Subsequent operation revealed that the filter unit was still not operating properly, and a new unit was necessary.

ANALYSIS OF OCCURRENCE:

The lint collected from the trailer unit was weighed and analyzed on a multi-channel analyzer.

The sample weighed 0.9 grams, with 4

a total activity of 8.9X10-2pci.

D i

1

--,--e.-.

LER 82-ll/03L CORRECTIVE ACTION:

The affected area, approximately 10 feet by 10 feet, was slightly contaminated.

Traces of Cs-137, Co-60, and Co-58 were detected.

The area was decontaminated in approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Subsequently, the trailer.was removed and replaced by a new unit.

A lint collector was installed on the dryer discharge.

This event constituted no radiological hazard to the environment or general public.

FAILURE DATA:

Not Applicable Prepared By F.

Dickey

  • d -

bm w h General Manager -

~

Salem Operations SORC Meeting No.