05000000/LER-1977-038-03, /03L:on 770519,RCS Leakage Determined to Be Greater than 10 Gpm from Stem Leakoff on Manual Isolation Valves 1PS24 & 1PS28 for Pressurizer Spray Valves.Caused by Packing Leakage.Valves Will Be Repacked at Next Outage

From kanterella
(Redirected from 05000000/LER-1977-038-03)
Jump to navigation Jump to search
/03L:on 770519,RCS Leakage Determined to Be Greater than 10 Gpm from Stem Leakoff on Manual Isolation Valves 1PS24 & 1PS28 for Pressurizer Spray Valves.Caused by Packing Leakage.Valves Will Be Repacked at Next Outage
ML20086D579
Person / Time
Site: Monticello, Salem, 05000000
Issue date: 05/23/1977
From: Spencer T
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19289B550 List:
References
LER-77-038-03L, LER-77-38-3L, NUDOCS 8312020406
Download: ML20086D579 (1)


LER-1977-038, /03L:on 770519,RCS Leakage Determined to Be Greater than 10 Gpm from Stem Leakoff on Manual Isolation Valves 1PS24 & 1PS28 for Pressurizer Spray Valves.Caused by Packing Leakage.Valves Will Be Repacked at Next Outage
Event date:
Report date:
0001977038R03 - NRC Website

text

,

[q. r o

o 77-38/03L 5/19/77 l

LICENSEE EVENT REPORT L

cominot stocx I I I I I I I i

e LICEMSENUMeta TVN Nk oiINfJ!SIGlSlll lo101-1olol01olof-I01of I4111111111 JTq.

La 9

14 13 43 ;lu A

CATEGoAv1 u

ooCMET NuMGER EVENT oATE SEpoAT oATE oi cou 7 ILJ LL) 1015101-10121712i 101si1 917171 1015I2I317171 55-su si es as 74 7s ao event oEsCRIPfloM o2. l Ae (M26 hours in Mode 2 onaration. identified RCS lamkmen was deteminedl 7

Is 30 E l to be arester than 10 GPM.

Action Statement (b) for LCO 3.4.6.2 was im-1 7 as so o4 l plemented. Leakage was determined to be coming from the stem leakoff ont 7 ss

.o l 1PS24 & 1PS28 (Manual Isolation Valves for Pressurizar Spray Valves).

l l

7 as ao j

oei Valves 1PS24 & IPS28 were placed on their backseat and identified leakagp

  • E*E" "fuba"*

.!!u",*Pfv'u"a*E n c

ca oMEurcoot viccArion

{

g IZlZIZIZIZ l ZI 9; 91 l

CAusE oEsCMIPfloN lo ts i Packing leakane past the stems on valves 1PS24 and 1PS28 caused the excess M s oc la.Ls, I inakmee.

Valves will be renacked at the next scheduled outana.

r as si iol I

7 8s 40

'sT$'fs" stArus 5'sco*vifv" i

u sao=En ovi.E[A oiscovtav DEECainvien Q

p.

1010131 N

I I

N/A I

I to 12 13 44 4

d5 so IT2" RE E$ko o LEASE Apoumf cF ACTsvsTV LoCAftoM op AELEAst W

LZJ l

N/A 1

l N/A I

M s

Ti si 44

.s ao pensosant execs.t.ess muweta tv s otsCaievion ils 1010101 121 i

N/A I

Ms n

T is so i

Pf RsoNNEL INJUMBEs Muweta otsC at*TioM i4 1010101 i N/A

- l 7

is n

u so cars:Ta consacue=cs:

A ',

"'A-4 Loss om oAMAGE To FACILITY TV8E oESCRieTioM i

ig e

8312020406 790426 PusticiTY PDR ADOCK 05000263 El n/a S

PDR 7 ss Aoostio=AL P Actons EVENT DESCRIPTION (Continued) ie I um a reduced to raro. Aceton Stata= ant (b) for LCO 3.4.6.2 was terminated !

Is n

g I at 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />. This is the 2nd occurrence of this type (REF.77-20/03L). ;

(77-38/03L)

Ext. ' Sale::1 c23 mAme:

':'. ' L. Scencer enous; (609)365-7000